Skip to content

P3 - OBD2 Vent Multi-Gauge V3 – MK6R

$729.95

Product availability:

  • Ships from P3 facility within the US in 1-2 business days.
  • Average shipping and processing times are 1 - 2 weeks. 

P3 V3 Gauge Features:

  • Plug and Play Install - plugs directly into your OBD2 port (want to keep your OBD2 port open? hard-wire harness kit also available)
  • OEM Integration - installs in your vent for a sleek install while retaining air flow
  • Versatility - read boost from multiple OEM sensors through OBD2 port or using optional P3 analog boost sensor
  • Code Reading/Clearing - read and clear diagnostic trouble codes (DTCs) on the fly

P3 V3 Gauge Readouts (all readouts can be individually configured to read in either Imperial or Metric units:

  • Boost (through OBD2 port using OEM sensors or with P3 analog boost sensor)
  • Coolant temperature
  • Air/Fuel ratio (can be read in AFR or Lambda)
  • Vehicle speed (can be calibrated in 1% increments from -9% to +20%)
  • Intake air temperature
  • Throttle angle
  • Ignition timing
  • Engine RPM
  • Exhaust gas temperature
  • Battery voltage
  • Programmable shift light
  • Analog input 1 (brown wire) can allow gauge to read any 0-5 volt linear output sensor
  • Analog input 2 (blue wire) can allow gauge to read any 0-5 volt linear output sensor
  • Acceleration timers (0-60mph/0-100mph/60-130mph)
  • Braking timers (60-0mph/100-0mph)
  • Includes Digital Display, Custom OBD Wire Harness, Control Box.

SKU: R3P3VGR6

    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.
    • ON LEAVE UNTIL JANUARY 3RD EXPECTED DELAYS WITH ENQUIRIES AND SHIPPING.